All Africa Scale Production Planning Requirements 3 planning personnel from each country for the 54 countries:
Solar Product Groups: Heat Storage Injection (Burner)
Turbine + Generator (TB + Gen)
Heat Transfer Buffer (HTB7 and HTB3)
Heat Storage (HS)
Super Heater
Power Supply = 6 groups
Number of employees for the planning: = 3 * 54 * 6 = 972 persons
plus other assistants as related to the size of each country and the need arises.
Designing a medium size Solar Heat Engine to deliver 1MW+ electric power